Honeywell today enhanced its Battery Manufacturing Excellence Platform (MXP) for lithium-ion battery manufacturers and gigafactories through a collaboration with Arbin Instruments to integrate an advanced autonomous formation system.
Blog
Topics
Most Popular
- Turnkey Battery Testing
- Why can’t I see the auxiliary value even though I have already mapped it?
- Why does my schedule stop immediately after starting?
- Arbin Participates in International Battery Seminar & Exhibit 2026 as Corporate Sponsor
- Arbin Showcases Advanced Battery Testing Solutions at The Battery Show Asia 2026 in Hong Kong
LATEST
Why can’t I see the auxiliary value even though I have already mapped it?
In some cases, users may successfully configure (map) an auxiliary channel, but the corresponding auxiliary values do not appear during test execution. This issue is typically caused by missing schedule assignment or incomplete auxiliary channel configuration within the schedule. Possible Causes No schedule or an incorrect schedule is assigned to the channel Forgot to add […]
Why does my schedule stop immediately after starting?
In some situations, a schedule may stop immediately after it starts. This behavior usually occurs when certain safety conditions are not met or when required devices are not properly connected. The system automatically stops the schedule to prevent unexpected behavior, hardware damage, or unsafe operating conditions. This article provides common causes and troubleshooting steps to […]
Arbin Participates in International Battery Seminar & Exhibit 2026 as Corporate Sponsor
Arbin Instruments recently participated in the International Battery Seminar and Exhibit 2026 in Orlando, Florida—one of the industry’s most established events focused on battery technology and energy storage innovation. As a proud Corporate-level sponsor, Arbin was honored to support this premier gathering of researchers, engineers, and industry leaders from across the global battery community. The […]






