Quotation Request Form for Fuel Cell Test Systems

Please answer the following questions to better help us understand your requirements.  If you do not know an answer to one of the questions, or if the question does not apply to your application, please leave that question blank.  If you need to purchase multiple systems or you are interested in test stations for different power ranges, please limit your responses on this request to only one system. You may submit a separate form for your other requirement or you may discuss your other requirement with the Arbin representative when they contact you. We will contact you at the information provided if we have any questions following your submission.

* Indicates required fields. 

   
 
 
 
 
Application:
  1. What types of fuel cells will you be testing (select all that apply)? *









 
   
  2. Please select the number of channels for your fuel cell testing system:
 



   
  3. Do you test single cells or stacks?*



   
  4. What type of testing do you plan to use the system for? *
 
   
  5. Which of the following standard FCTS systems are you interested in? Please select the standard system which is closest to your requirements. Note: standard systems can be modified to exactly meet your requirments.*
 
Product Name Description Specifications
- Testing System for Liquid Fuel Cells up to 10W more info
- Testing System for PEM Fuel Cells up to 20W more info
- Testing System for PEM and Liquid FC up to 20W more info
- Testing System for Liquid Fuel Cell up to 50W more info
- Testing System for PEM Fuel Cells up to 50W more info
- Testing System for PEM and Liquid FC up to 50W more info
- Testing System for PEM Fuel Cells up to 200W more info
- Testing System for Liquid Fuel Cell up to 200W more info
- Testing System for PEM and Liquid FC up to 200W more info
- Testing System for Liquid Fuel Cell up to 500W more info
- Testing System for PEM Fuel Cells up to 500W more info
- Testing System for PEM and Liquid FC up to 500W more info
- Testing System for PEM Fuel Cells up to 1kW more info
- Testing System for PEM and Liquid FC up to 1kW more info
- Testing System for PEM Fuel Cells up to 3kW more info
- Testing System for PEM Fuel Cells up to 5kW more info
- Testing System for PEM Fuel Cells up to 10kW more info
- Testing System for PEM Fuel Cell above 10kW
- Testing System for Solid Oxide Fuel Cells  
- Other Fuel Cell Testing System  
     
     
Electronic Load Requirments:
  6. What is the MAXIMUM voltage required ? *
 
   
  7. What is the MINIMUM voltage required ? *
 
   
  8. What is the maximum current required? *
     
  9. What is the smallest current you need to control or measure? *
   
  10. What is the maximum power required? *
   
Reactant Flowrates:
  11. Please specify the TYPE of gas or liquid fuel you need on the ANODE side (such as Hydrogen, Reformate Mix, Methanol, CO, Nitrogen, etc.) AND the maximum flowrate required for each fuel selected. NOTE: If liquid fuel, units should be in ccpm. The standard anode gas is Hydrogen and the standard flowrate for each system above can be found here for 10W - 200W and here for 500W - 10kW. If you would like the standard configuration, simply write "standard" under Fuel 1.*
 
slpm
slpm
slpm
slpm
slpm
   
  12. Please specify the TYPE of gas or liquid you need on the CATHODE side (such as Oxygen, Air, Nitrogen, etc.) AND the maximum flowrate required for each reactant selected. Note: If liquid reactant, units should be in ccpm. The standard cathode gas is Air and the standard flowrate for each system above can be found here for 10W - 200W and here for 500W - 10kW. If you would like the standard configuration, simply write "standard" under Oxidant 1.*
   
slpm
slpm
slpm
slpm
slpm
   

Humidification

   
 
   
Temperature Control
   
   
 
   
  14. Do you need PID electronic heater cartridge control?*
   
   
   
  15. What is the maximum opperating temperature required?
   
   
Auxiliary Measurments and Options
  16. Do you require individual cell voltage measurment channels (auxiliary voltage)?
   
 
   
  17. Do you require any blank thermocouple input channels? Note: The system measures all gas and liquid temperatures automatically. These are additional temperature input channels.
   
 
   
 

18. Do you require any other optional items? (Hold down ctrl to choose multiple selections)

    More info about options
   
Miscellaneous
  19. Do you have a particular budget that you would like for us to know about?
 
   
  20. When do you plan to purchase? *
 







 
   
  21. How did you learn about Arbin Instruments? *
   


 
   
  22. Other Comments or Information we should know about?
 
   
   
Contact Information:
   
 
 
 
 
 
 
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
                   

  762 Peach Creek Cut Off Rd. College Station, TX 77845, USA Phone: (979) 690-2751 Fax: (979) 690-2761

Copyright © 2007